Reporting

On-budget delivery

Where it stands, and what it is built from.
No goal set
Movement

This is a problem on our side. It is being monitored and does not need action from you.

Where it stands

On-budget delivery
83%
no target yet, pending a baseline
Project tracker · as of Oct 22, 2026
Latest period: 0.8333333333333334

Monthly, up to the last 12 months

The full reasoning is not built yet

Blocked on grain. Projects carry a budget with no paired actual cost (mig 288), so on-budget runs on a deal-level proxy and cannot be decomposed to the project that overran. See SL-PROJ-COST.

Owned by SL-METRIC-REASONING-2.

What the numbers suggest

Not a verified cause. These are what the readings behind this tile point at.

  • Computed over 6 of 10 project(s): the ones carrying both a budget and a cost of their own.
  • 4 project(s) carry a budget but no spend of their own to set against it, usually because time and expenses are recorded against the client rather than the project. A client-wide cost is never subtracted from one project's budget, so those are excluded and named here.
Help and feedbackAvailable after sign-in